Each quarter, SIGIR releases a Report to Congress to summarize key findings on progress of Iraq reconstruction efforts. These findings are communicated in the report using figures, charts, and pictures.

The following pictures were published in the October 2007 Quarterly Report:

  Two shepherds and an employee from the Diyala Department of Veterinarians process sheep through a dowsing basin to rid the animals of parasites and increase their value.
Hi-Res JPEG
  Regional transmission lines remain vulnerable to attacks and looting.
Hi-Res JPEG
  Roadside gas pumps. Shortages of fuel continue to affect all sectors of Iraq’s economy.
Hi-Res JPEG
  The Mosul Dam supplies drinking water, irrigation, flood control, and hydroelectric power to the surrounding region. Access to clean water remains a critical issue across Iraq.
Hi-Res JPEG
  CERP-funded road construction.
Hi-Res JPEG
  Site Photo 1. Mosul Dam in operation (photo courtesy of ITAO).
Hi-Res JPEG
  Site Photo 2. View of the partially constructed stationary silos.
Hi-Res JPEG
  Site Photo 3. Close-up view of foundation bolts for the stationary silos.
Hi-Res JPEG
  Site Photo 4. Close-up view of foundation bolts for the stationary silos.
Hi-Res JPEG
  Site Photo 5. View of the “modified” 100-m3/hour grout-mixing plant.
Hi-Res JPEG
  Site Photo 6. Interior view of an Integrated Analytical System unit.
Hi-Res JPEG
  Site Photo 7. Interior view of an Integrated Analytical System unit.
Hi-Res JPEG
  Site Photo 8. General Electric Frame 9E turbine unit.
Hi-Res JPEG
  Site Photo 9. General Electric LM-6000 turbine unit.
Hi-Res JPEG
  Site Photo 10. Newly constructed road with shoulders.
Hi-Res JPEG
  Site Photo 11. Box culverts for new road.
Hi-Res JPEG
  Site Photo 12. Road excavation, leveling, and rolling of the sub-grade (photo courtesy of USACE).
Hi-Res JPEG
  Site Photo 13. Aggregate base and concrete base pour (photo courtesy of USACE).
Hi-Res JPEG
  Site Photo 14. Newly constructed road.
Hi-Res JPEG
  Site Photo 15. Settling tank (photo courtesy of USACE).
Hi-Res JPEG
  Site Photo 16. General maintenance on the interior of the booster pump room.
Hi-Res JPEG
  Aerial Image 1. Imagery overview of the Shasheed Shazad Power Plant taken on July 6, 2007.
Hi-Res JPEG
  Aerial Image 2. Imagery taken on August 3, 2007, of the Al Mawsil Bedoush dam site, a proposed backup dam for the Mosul Dam, which was assessed this quarter in SIGIR PA-07-105.
Hi-Res JPEG
  Aerial Image 3. Imagery overview of the Right Bank Drinking Water Treatment Plant taken on February 27, 2007.
Hi-Res JPEG
  Aerial Image 4. Overview of the Mosul Dam, which SIGIR inspectors visited this quarter.
Hi-Res JPEG